Underlay and vapour barrier – what goes under the floor?
A floating floor, meaning laminate or click parquet, always needs an underlay. On concrete it also needs a vapour barrier (a damp-proof membrane) to stop moisture coming up from below. On a dry timber floor between two heated storeys, the underlay is usually enough. Here is what applies to your subfloor, which underlay to choose and when you can lay straight over the old floor.
| You are laying on | Vapour barrier? | Underlay |
|---|---|---|
| Concrete or screed, even old, and basement floors | Yes | Foam or acoustic underlay on top of the membrane |
| Aerated concrete | Yes | As above |
| Timber floor over a crawl space, boiler room or utility room | Yes | As above |
| Underfloor heating | Yes | Thin underlay approved for underfloor heating |
| Floorboards or chipboard between two heated storeys | Usually not | Foam or acoustic underlay |
| Vinyl, lino or tiles | Same as for the floor underneath | Foam or acoustic underlay |
| Carpet | Take the carpet up first | |
Always follow the instructions for your floor if they say something different. Click vinyl often has its own rules, so read the pack.
Do I need a vapour barrier?
Concrete gives off moisture for years, even when it feels dry. That is why Kährs requires a vapour barrier on a ground-bearing concrete slab, aerated concrete, floors over a ventilated crawl space, floors over warm or damp rooms such as a boiler room or utility room, and on underfloor heating, however old the subfloor is. Pergo requires a moisture barrier on every mineral subfloor and always on underfloor heating. Tarkett says the same: a vapour barrier on concrete and wherever you suspect damp.
On a timber floor between two heated storeys you usually don’t need one. Kährs writes that moisture protection is normally not needed on floors with a relative humidity below 60%.
New concrete or screed always gets a vapour barrier and must be properly dry first. Above 90% relative humidity a plastic sheet is not enough, and the damp has to be dealt with before you lay the floor. If in doubt, have the moisture measured.
How to lay the vapour barrier
- Use ageing-resistant 0.2 mm polythene (200 micron, often sold as 1000 gauge).
- Let the sheets overlap by at least 20 cm and tape the seams.
- Turn the sheet up a few centimetres at the walls and trim it off under the skirting.
- The membrane goes under the underlay, as close to the floor as possible.
- With 2 m wide sheets and a 20 cm overlap you need about 10% more membrane than the floor area.
If you choose an underlay with a built-in vapour barrier (often sold as “with DPM”), you don’t need a separate sheet. Lay it edge to edge and tape the seams, or as the manufacturer says.
Which underlay should I choose?
The underlay evens out small bumps and reduces noise. Two kinds of sound are worth telling apart: impact sound is what the neighbours below or next door hear, and walking sound is the clatter you hear yourself in the room. Underlays often list both.
- Foam, 2–3 mm: the cheapest and most common. Enough in a house.
- Acoustic underlay: the one to choose in a flat. Check your lease or ask the freeholder or managing agent whether they require sound insulation before you buy.
- Combined underlay with a built-in vapour barrier: saves a step on concrete.
Three rules that apply to almost every floor:
- Never two layers of underlay. The floor gets too soft and the click joints can break.
- If the planks have an underlay attached, don’t add another, but you still need the vapour barrier on concrete.
- Thicker is not better. A soft underlay makes the floor bounce. Underlay doesn’t fix big dips; levelling compound or sanding does.
Underfloor heating: choose a thin underlay approved for it. Haro says the floor and underlay together should ideally not insulate more than about 0.15 m²K/W, or the heat won’t get through.
Can I lay over the old floor?
- Vinyl and lino: yes, if it is stuck down, undamaged and flat. Tarkett and Pergo allow it. If it sits on concrete, you still need a vapour barrier.
- Tiles: usually, if the tiles are firmly fixed and the floor is flat.
- Floorboards and chipboard: yes. Screw down loose boards first so the floor doesn’t creak.
- Carpet and other soft coverings: no. Remove both the carpet and the underlay beneath it.
- Straight onto the joists: no. A floating floor needs a load-bearing subfloor.
How flat must the subfloor be?
Lay a straight batten or straightedge on the floor and measure the gap underneath. Kährs accepts at most ±3 mm under 2 m, ±2 mm under 1 m and ±1.2 mm under 25 cm. Pergo allows at most 2 mm under 1 m. Sand down high spots and fill or level dips before you lay the membrane and underlay. An uneven subfloor is the most common reason a floor creaks, opens up at the joints or breaks its click locks.
Draw your room and Parquet Planner works out how many square metres of underlay and vapour barrier you need, along with planks, packs and skirting.
Plan my floorFrequently asked questions
Do you need a vapour barrier under laminate flooring?
Yes on concrete and screed, however old, on aerated concrete, on floors over a crawl space or over a boiler or utility room, and always on underfloor heating. On a dry timber floor between two heated storeys you usually don’t. Use 0.2 mm polythene with at least 20 cm overlap, or an underlay with a built-in vapour barrier.
Which underlay should I use under laminate?
In a house, 2–3 mm foam is usually enough. In a flat, choose an acoustic underlay, because it reduces the noise reaching the neighbours below. If the planks already have an underlay attached, don’t add another. Never lay two layers of underlay.
Can you lay laminate over vinyl?
Yes, if the vinyl is stuck down, undamaged and flat. If it sits on concrete, you still need a vapour barrier. Carpet and other soft coverings must always come up.
How flat does the subfloor need to be?
Kährs specifies at most ±2 mm under a 1 m straightedge and ±3 mm under a 2 m straightedge. Pergo specifies at most 2 mm over 1 m. Sand down high spots and fill dips before you lay the underlay.
Does the vapour barrier go above or below the underlay?
Below. The polythene goes straight onto the concrete with at least 20 cm overlap and taped seams, and the underlay is rolled out on top.
More guides
- How to lay laminate flooring – the whole job step by step, with radiator pipes and door frames.
- Laminate flooring calculator – planks, packs and waste.
Sources
- Kährs, Installation instructions for floating wood floors, in Swedish (vapour barrier, underlay, flatness, moisture).
- Pergo, Laminate installation instructions, in Swedish (moisture barrier, vinyl, flatness, underfloor heating).
- Tarkett, Laying laminate flooring, in Swedish (vapour barrier on concrete, laying over vinyl and wood).
- EPLF, Underlay Materials (impact and walking sound, thickness and softness).
- Haro, Floors on underfloor heating, in German (thermal resistance 0.15 m²K/W).
Updated 8 October 2026.